From observations to project cost

BasinmodlR follows a geothermal heat project from what is known about the subsurface to its value for the company that would build it. The chain has six steps, each a function that returns a plain table:

  1. project_reservoir(): aquifer properties at the site;
  2. project_doublet(): flow, temperature and power of a doublet in each aquifer;
  3. project_demand(): the heat users;
  4. project_network(): the transport pipeline and the heat network;
  5. project_costs(): heat sold, investment and running costs;
  6. project_value(): cash flow, net present value, debt cover and break-even heat price.

geothermal_project() runs all six. What differs between countries and companies is kept apart in one object, project_setup(), so the chain itself never changes.

library(BasinmodlR)

1. The subsurface: from what is known

A basin model

A burial and thermal history model gives, for every unit, its present depth and thickness, the porosity it kept from its deepest burial (compaction is irreversible) and its temperature. project_reservoir() turns the units into aquifers; permeability follows from porosity with a lithology relation (lithology_table()) or a relation fitted on well data (fit_poroperm()).

model <- run_basin_model(brabant)
aquifers <- project_reservoir(model, site = c(0, 0), lithology = c("layer 4" = "sandstone", "layer 2" = "sandstone"))
aquifers[, c("id", "top_depth", "thickness", "porosity", "permeability_md", "gradient_c_km", "porosity_basis")]
#>                              id top_depth thickness   porosity permeability_md gradient_c_km
#> 1                       layer 5       500        50 0.09375919       22.597395      28.75006
#> 2                       layer 4       550       750 0.08161826       14.515085      27.70415
#> 3           Rebecq Gp. (unit 5)      1300        50 0.06785225        8.095194      27.17645
#> 4                       layer 2      1350      2000 0.04179939        1.791022      26.78599
#> 5 Jodoigne-Mousty Fms. (unit 2)      3350      2750 0.05440858        4.056012      22.39929
#>   porosity_basis
#> 1     max burial
#> 2     max burial
#> 3     max burial
#> 4     max burial
#> 5     max burial

The Brabant Massif units are old and deeply buried: porosity and permeability are far too low for a doublet. That is the answer for this basin, and the chain carries it through. For the rest of this vignette we use a layer table, the second common starting point.

A layer table

Only depth and thickness are required; lithology, porosity, permeability, temperature and uplift are used when they are given and estimated when they are not. The column perm_basis says where each value came from.

layers <- data.frame(id = c("upper sand", "lower sand"), top_depth = c(1800, 2400),
                     thickness = c(80, 120), lithology = "sandstone", perm_md = c(250, NA),
                     uplift_m = c(0, 300), temp_c = c(70, 88))
res <- project_reservoir(layers, site = c(0, 0))
res[, c("id", "porosity", "permeability_md", "perm_basis", "porosity_basis")]
#>           id  porosity permeability_md           perm_basis porosity_basis
#> 1 upper sand 0.2981584        250.0000                given     max burial
#> 2 lower sand 0.2325835        481.0368 lithology + porosity     max burial

Other inputs feed the same step: prospect_site() for one well-known site, prospects_from_boreholes() and prospects_from_grid() for borehole data and maps, read_thermogis_aquifer() for the Dutch ThermoGIS grids, and sonic_to_porosity(), fit_poroperm() and calibrate_prospects() for well logs.

2. The set-up: country and company

nl <- project_setup("NL")
nl
#> Project set-up 'NL' (EUR)
#>   Netherlands: PBL SDE++ 2026 reference costs, SDE++ 2026 (provisional correction amount), project finance (70 % debt), ThermoGIS doublet design
#>   cost basis   : PBL SDE++ 2026 reference, deep geothermal < 12 MWth; fixed O&M 117/kW/yr, electricity 80/MWh, plant 150000/MW, pipeline 1000/m
#>   investor     : project_finance (decides on equity NPV), debt 70 % at 5.75 % over 10 yr, tax 25.8 %
#>   subsidy      : SDE++, 15 years
#>   well design  : skin -1 / -1, well distance 1500 m, pump pressure rule: thermogis

The Dutch preset uses the reference installation of PBL’s SDE++ 2026 advice, the SDE++ 2026 subsidy and PBL’s project-finance terms. A greenhouse grower in the same country has its own financing and tax position:

grower <- project_setup("NL", investor = "grower", subsidy = NULL)

For a country without a preset everything is given. The values below are only an illustration; use local quotes for wells, plant and networks, the national tax rate and the subsidy that applies.

other <- project_setup("custom",
  economics = project_economics(well_cost_coef = c(0.25, 800, 3e5), elec_price = 150, fixed_om_per_kw = 90),
  investor = "utility", investor_args = list(tax_rate = 0.30),
  subsidy = list(subsidy_investment(0.4, cap = 1e7), subsidy_production(eur_mwh = 15, years = 10)),
  description = "illustrative utility in a country with an investment grant and a production premium")
other
#> Project set-up 'custom' (EUR)
#>   illustrative utility in a country with an investment grant and a production premium
#>   cost basis   : given; fixed O&M 90/kW/yr, electricity 150/MWh, plant 150000/MW, pipeline 1000/m
#>   investor     : utility (decides on project NPV), debt 50 % at 5.75 % over 10 yr, tax 30.0 %
#>   subsidy      : investment grant, 40 % of the investment (cap 1e+07)
#>   subsidy      : production premium, 10 years
#>   well design  : skin -1 / -1, well distance 1500 m, pump pressure rule: thermogis

A set-up can be registered under a name for the rest of the session (register_project_setup()) and saved with saveRDS() to share it within a company.

3. The doublet

dbl <- project_doublet(res, nl, t_return = 35)
dbl[, c("id", "pump_bar", "production_temp", "q_m3h", "power_mw", "cop", "status")]
#>           id pump_bar production_temp    q_m3h  power_mw      cop status
#> 1 upper sand 58.48330        68.90938 196.8149  6.639451 12.45937     ok
#> 2 lower sand 78.18962        87.19890 468.2057 24.972918 14.73456     ok

The pump pressure follows the ThermoGIS rule (30 percent of the hydrostatic pressure at mid-aquifer) unless the set-up says otherwise. engine = "screen" gives the closed-form screen, fast enough for national grids.

4. Demand and network

users <- project_demand(data.frame(id = c("greenhouses", "hospital", "district"),
                                   x = c(1500, 1800, 2100), y = c(200, -300, 400),
                                   annual_MWh = c(40000, 25000, 30000)),
                        hours = 5000, min_temp_c = 60, return_temp_c = 35, price_eur_gj = 14)
users
#>            id   group    x    y annual_MWh hours peak_mw min_temp_c return_temp_c price_eur_gj
#> 1 greenhouses clients 1500  200      40000  5000       8         60            35           14
#> 2    hospital clients 1800 -300      25000  5000       5         60            35           14
#> 3    district clients 2100  400      30000  5000       6         60            35           14
net <- project_network(users, site = c(0, 0))
net$pipe_m
#> [1] 1773.309

Without street data the network is estimated from straight distances. With streets (for example from OpenStreetMap, read_osm_streets()), the network is routed along them and every pipe is sized:

streets <- list()
for (k in 0:5) {
  streets[[length(streets) + 1]] <- data.frame(osm_id = k + 1, seq = 1:2, x = c(0, 2400), y = c(-800, -800) + k * 400)
  streets[[length(streets) + 1]] <- data.frame(osm_id = k + 11, seq = 1:2, x = c(0, 0) + k * 480, y = c(-800, 1200))
}
streets <- do.call(rbind, streets)
routed <- project_network(users, site = c(0, 0), streets = streets, setup = nl)
routed$network
#> <gd_network>
#>   clients routed      : 3 of 3
#>   trench length       : 6.20 km of main + 0.30 km of service
#>   diversity factor    : 0.82 at the plant, 1.00 on single-client branches
#>   peak load at plant  : 15515 kW
#>   diameters           : DN200 to DN250
#>   network cost        : 9.92 million (1579 per m of trench)

5. and 6. Costs and value, or the whole chain at once

p <- geothermal_project(res, users, nl, site = c(0, 0))
p
#> Geothermal project (set-up 'NL', investor project_finance)
#>   2 aquifer(s) from layer table; 3 client(s), 95.0 GWh/yr; transport pipeline 1773 m
#>     aquifer depth_m  T_C flow_m3h    MW sold_GWh capex_M npv_M dscr breakeven status
#>  upper sand    1800 68.9      197  8.01     56.2    10.2  13.9  3.5       2.2     ok
#>  lower sand    2400 87.2      468 29.33     95.0    16.8   9.5  2.3       9.3     ok
#>   best: upper sand, 8.0 MW, 56 GWh/yr sold, investment 10.2 MEUR, decision NPV 13.9 MEUR -> feasible

The same chain for the grower and for the other set-up:

for (s in list(grower, other)) {
  b <- geothermal_project(res, users, s, site = c(0, 0))$best
  cat(sprintf("%-8s best %s: NPV %.1f M, break-even %.1f per GJ, feasible %s\n",
              s$investor$type, b$id, b$npv / 1e6, b$breakeven_eur_gj, b$feasible))
}
#> grower   best upper sand: NPV 7.4 M, break-even 9.6 per GJ, feasible TRUE
#> utility  best upper sand: NPV 15.9 M, break-even 6.6 per GJ, feasible TRUE

Every intermediate number is in the result, for example the cost items and the cash flow of the chosen aquifer:

p$best[, c("capex_wells", "capex_plant_pump", "capex_pipeline", "capex_distribution", "capex_connections",
           "opex_fixed", "opex_pumping", "heat_sold_mwh", "coverage")]
#>   capex_wells capex_plant_pump capex_pipeline capex_distribution capex_connections opex_fixed
#> 1     5316288          1701297        1773309           568172.5          800864.7   937011.7
#>   opex_pumping heat_sold_mwh  coverage
#> 1     299326.7      56231.34 0.5919089
head(project_cashflow(p))
#>   year revenue     sde    opex  ebitda interest debt_service depreciation eia      tax
#> 1    1 2834060 2527529 1236338 4125250 408937.2     954873.9     677328.8   0 784057.9
#> 2    2 2890741 2527529 1261065 4157205 377545.9     954873.9     677328.8   0 800401.1
#> 3    3 2948556 2527529 1286286 4189798 344349.5     954873.9     677328.8   0 817374.9
#> 4    4 3007527 2527529 1312012 4223044 309244.4     954873.9     677328.8   0 835009.4
#> 5    5 3067677 2527529 1338252 4256954 272120.7     954873.9     677328.8   0 853336.1
#> 6    6 3129031 2527529 1365017 4291542 232862.4     954873.9     677328.8   0 872388.6
#>   cash_to_equity project_cash
#> 1        2386318      3235687
#> 2        2401930      3259397
#> 3        2417549      3283581
#> 4        2433160      3308249
#> 5        2448744      3333411
#> 6        2464280      3359075

From one project to a whole country

For a region or a country the same ingredients are used on a grid: subsurface_potential() samples every aquifer of a ThermoGIS download (or your own grids) and couple_potential() tries every allowed cell within pipeline reach of every cluster of clients, with the same costs and investor profiles. model_audit_report() writes an HTML report with every step behind the result. These need the packages ‘sf’ and ‘terra’:

pot <- subsurface_potential("D:/geothermal/thermogis_webmaps_TNO_RD_new", spacing_m = 1000)
groups <- list(client_layer("greenhouses.gpkg", 240, "kWh_m2", sector = "greenhouse"),
               client_layer("industry.gpkg", "GJ", "GJ", group = "industry", hours = 6000, min_temp_c = 90))
zones <- list(constraint_layer("natura2000.shp", "natura2000"))
x <- couple_potential(pot, groups, zones, investor = nl$investor, sde = sde_scheme())
model_audit_report(pot, groups, zones, file = "audit.html")

The doublet engine on its own (after DoubletCalc) is described in the help of doublet_spec(), doublet_simulate() and doublet_monte_carlo(); worked case studies are in system.file("scripts", package = "BasinmodlR").